BobsYourUncle69
Well-known member
So , I went from having a 753 ft2 space comprising of 4 rooms and a larger undercover work area in Johannesburg south africa to a double door closet in an apartment in NY.
I had a dedicated room for my laser cutter and related stuff.
A dedicated room for my power tools and air compressor, basically just a drill press , various electric saws , a table saw , a metal cutter , arc welder and the likes, then a room for electronic kinda of stuff with the outdoor area under a 6 car carport to do my arc welding etc.
I now have a double door closet and I'm trying to make this work but also don't have nearly what I had in SA but this is a progress pic on trying to make this closet functional.
We plan on buying a house and my shop space will change.
This is after day one and before 9ve added additional shelving. I've used the spaces between our kitchen cabinet and the ceiling to store my socket sets.
This is tge before photo after a couple of hours worth of " effort "
A before Pic like this hopefully will make the after Pic look so much better.
I had a dedicated room for my laser cutter and related stuff.
A dedicated room for my power tools and air compressor, basically just a drill press , various electric saws , a table saw , a metal cutter , arc welder and the likes, then a room for electronic kinda of stuff with the outdoor area under a 6 car carport to do my arc welding etc.
I now have a double door closet and I'm trying to make this work but also don't have nearly what I had in SA but this is a progress pic on trying to make this closet functional.
We plan on buying a house and my shop space will change.
This is after day one and before 9ve added additional shelving. I've used the spaces between our kitchen cabinet and the ceiling to store my socket sets.
This is tge before photo after a couple of hours worth of " effort "
A before Pic like this hopefully will make the after Pic look so much better.