To avoid these ads, REGISTER NOW!

Nutts Enclosed Trailer project

To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!
OP
N

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,855
Location
Northern Central Ohio
Other than mounting the fairlead, this project is going to get back burner'd till Spring. Too many variables coming together.

*4 other Basic EMTs not picking up overtime at the station, leaving a majority of it to me and one other Lt

*I need to cut firewood for the winter and get some of the woods cleaned up.

*The trailer will be going into Winter storage. I also need to get the Cobra out of the garage and loaded.

*They are putting a municipal water line in. They are supposed to make a connection at my place....in the middle of my driveway.

Roll all this together, I need to cut the trailer floor and weld in some braces. It's going to be hard to do when my driveway is tore up. . . . or whatever.
 
To avoid these ads, REGISTER NOW!
Top Bottom