cvcman
Well-known member
Pole barn is up, pad has been down about 5 months,,,it has about 47" of bank run gravel fill in the rear, compacted every 10" and the pad sat for months before building went up...
I was thinking of just putting down a couple inches of crusher run and compacting and leaving it because I will probably just be using it to store a motorhome and tractor and cars...
But IF I decide to do concrete how long before I should do it ?? And can the floor be poured right on top of the bank run after its dried out ??
Is there any good thing about NOT doing concrete ?
I was thinking of just putting down a couple inches of crusher run and compacting and leaving it because I will probably just be using it to store a motorhome and tractor and cars...
But IF I decide to do concrete how long before I should do it ?? And can the floor be poured right on top of the bank run after its dried out ??
Is there any good thing about NOT doing concrete ?

