Got the red beam flipped over so I could weld the legs on. Of course I took zero pictures of that lol.
I even managed to make a decent looking weld for once !!
It took a bonkers amount of work to get the fab area this empty lol
Back beam flown in and set in place.
Red beam in and set. I had to ratchet strap the back beam to the forklift to pull it in a bit. I figured it was better to have to pull it in vs having to figure out how to push it away. It and the feet weigh right at 1600lbs. The red one and feet are close to 3700lbs.
Both beams set within and inch of they need to be. The orange beams will stay in and are there to keep it from racking too much until it gets secured to the walls.
We all celebrated a job well done by shooting some hoops !!
The pipes are sitting on a piece of 316SS on a chunk of old tire tube. Should keep it from moving and from rusting on the concrete. Gotta trim them nicely once the loft is finished so they look nicer.
Thanks for following along !!