I am currently planning a 36x48x12 pole building in Maryland. It will be used for a mix of wood and metal fabrication as a hobby for now and hopefully part time when I retire in the future.
I seem to rearrange my current spot quite frequently and attach certain equipment to the concrete floor (lathe, mill, grinders, work bench, etc). I really want to put PEX in the concrete of the new shop even if I don't utilize it for a few years, but am worried I will drill into it when setting equipment in the future. The standard seems to be 1/2" PEX with 12" spacing. At 24" spacing I would feel more confident about knowing where it is or being able to locate it with a FLIR camera from work. Will the spacing make the system ineffective, should I upsize the PEX, etc?
Thanks,
~Matt
I seem to rearrange my current spot quite frequently and attach certain equipment to the concrete floor (lathe, mill, grinders, work bench, etc). I really want to put PEX in the concrete of the new shop even if I don't utilize it for a few years, but am worried I will drill into it when setting equipment in the future. The standard seems to be 1/2" PEX with 12" spacing. At 24" spacing I would feel more confident about knowing where it is or being able to locate it with a FLIR camera from work. Will the spacing make the system ineffective, should I upsize the PEX, etc?
Thanks,
~Matt