How long can I leave Pex exposed to direct UV rays (sunlight) before I need to be concerned.
I would like to start laying the pex this week, however it will will be 10 to 12 days before the contractor can pour the slab. Garage currently has no doors installed and the sun will shine directly on 25% of the floor throughout the day.