Hey, new to your forum. My name is ricky and i am living in Rhode island. East coast weather. Snow, rain ect.
So i just purchase a house and it is on a 1.5 ache lot. It has a small slight angle downward towards the street level. Has many trees for me to cut down. Under 15 feet though so not huge. I will 100% be hiring someone for excavating the land and for concrete work. Ill cut trees but someone professional has to smooth land for me.
Anyways ill try not to put 2 months of thoughts into my firat post and make it as readable as possible lol.
Some info of garage...
I am allowed 875sqft and total hieght of 30ft. Therefore, my plan is to do 24 wide by 34 long. It puts me a tad under my sqft limit. I want to use attic truss so ill have a 12' wide by 34' long attic as nice finished space. The main portion of garage i want all empty space. Hieght will need to be atleast 12ft. Do not care for windows. One big garage door is perfect. One normal size access door is fine. Electrical will be a full 200amp service from national grid strait to building with own meter.
Some questions for now !
I am not sure type of garage to build? Pole barn seems cheap an efficient however cannot build myself. Metal building is ok however i want insulation. Mine as well do a full wood building and insulate it all, considering metal building would need wood studs for insulating.
Concrete has to be how thick for a lift? I will not be using garage for automotive for afew yrs but want to pour correct first time.
Huge problem is i cannot have a drain unless i tie into my septic. I cannot do that without having whole new inspection process BUT what if i were to put a drain into the slab sticking inside garage 6" and bury only couple feet with it capped off away from slab. This way after entire garage complete i can remove cap and pipe into septic with inspections ect.? Do not want to drill into concrete after its done.
I want to bury pvc and run pex tubing from my house with internet wire and cable wire. Should this come out of ground and through the concrete or can i do this after garage is built by coming out ground next to building and into side building?
My experience with building an entire structure is zero lol. I have plenty of hands on experience. I can do electrical and wood work. I have several people who help build garage with experience but i hate nagging people for newb questions. This is what forum are for !!! There is alot for me to plan before March when i start making calls for excavating. I want a fool proof plan for qhat i want and need to do before anything is started.
Thanks for any input. Ask any questions and advice for me.
So i just purchase a house and it is on a 1.5 ache lot. It has a small slight angle downward towards the street level. Has many trees for me to cut down. Under 15 feet though so not huge. I will 100% be hiring someone for excavating the land and for concrete work. Ill cut trees but someone professional has to smooth land for me.
Anyways ill try not to put 2 months of thoughts into my firat post and make it as readable as possible lol.
Some info of garage...
I am allowed 875sqft and total hieght of 30ft. Therefore, my plan is to do 24 wide by 34 long. It puts me a tad under my sqft limit. I want to use attic truss so ill have a 12' wide by 34' long attic as nice finished space. The main portion of garage i want all empty space. Hieght will need to be atleast 12ft. Do not care for windows. One big garage door is perfect. One normal size access door is fine. Electrical will be a full 200amp service from national grid strait to building with own meter.
Some questions for now !
I am not sure type of garage to build? Pole barn seems cheap an efficient however cannot build myself. Metal building is ok however i want insulation. Mine as well do a full wood building and insulate it all, considering metal building would need wood studs for insulating.
Concrete has to be how thick for a lift? I will not be using garage for automotive for afew yrs but want to pour correct first time.
Huge problem is i cannot have a drain unless i tie into my septic. I cannot do that without having whole new inspection process BUT what if i were to put a drain into the slab sticking inside garage 6" and bury only couple feet with it capped off away from slab. This way after entire garage complete i can remove cap and pipe into septic with inspections ect.? Do not want to drill into concrete after its done.
I want to bury pvc and run pex tubing from my house with internet wire and cable wire. Should this come out of ground and through the concrete or can i do this after garage is built by coming out ground next to building and into side building?
My experience with building an entire structure is zero lol. I have plenty of hands on experience. I can do electrical and wood work. I have several people who help build garage with experience but i hate nagging people for newb questions. This is what forum are for !!! There is alot for me to plan before March when i start making calls for excavating. I want a fool proof plan for qhat i want and need to do before anything is started.
Thanks for any input. Ask any questions and advice for me.