I am going to be breaking ground next week on a 50 x 50 steel building. I want to have a toilet and sink in it. I know absolutely nothing about plumbing other then **** flows down hill lol . What do I need to do before I pour the slab to facilitate the toilet and sink?
Likely due to my budget the actual toilet and sink won't be in place or connected for several months but I want to do the prep work for them.
Anything else I should be considering or thinking about before the build is started?
Likely due to my budget the actual toilet and sink won't be in place or connected for several months but I want to do the prep work for them.
Anything else I should be considering or thinking about before the build is started?
