I am not sure where to ask this question, but I figured it might get covered here.
My contractor messed up and poured the floor (monolithic slab) without putting in tubes to pass plumbing in/out of the shop. He said it would be no problem to add them later. Well he flaked out and can not seem to finish the job. Walls are up siding is done building is all dried in, but no plumbing. What is the best way to pass the fresh water in and sewer out through a already poured slab?
Thanks,
Dan
My contractor messed up and poured the floor (monolithic slab) without putting in tubes to pass plumbing in/out of the shop. He said it would be no problem to add them later. Well he flaked out and can not seem to finish the job. Walls are up siding is done building is all dried in, but no plumbing. What is the best way to pass the fresh water in and sewer out through a already poured slab?
Thanks,
Dan