sweetk30
Well-known member
Friend is having a pole barn shop built . Guy doing building said he just dumps dry concrete mix in the hole and set pole and backfill with dirt .
I always was under the impression its wet mix for concrete and then set .
Seems wierd like it could let the posts drop if the dry mix gets wet . The frost line around here is 48inch .
Whats the general rule for setting these poles ? Thanks for the help .
I always was under the impression its wet mix for concrete and then set .
Seems wierd like it could let the posts drop if the dry mix gets wet . The frost line around here is 48inch .
Whats the general rule for setting these poles ? Thanks for the help .