line guy
Active member
I changed plans for heating barn. put stone in for 5inch concrete slab and heat with wood stove or other options. Now I am going for infloor radiant heat. Digging down the side between post is a pain but needs to be done,. along with excavating out 7 inches of stone. Should I run the 2 inch foam board from top of skirt board down 12 inches, or where the top of concrete will be on skirt board? Any suggestion to make it easy would help. I like easy.
