I'm looking to put a 5" slab in a 30x56 pole barn. Will likely have to do this in sections. What I'm wondering is, with a rebar mat ******* 18" on center what do I need to consider if I'm thinking of renting a power buggy to haul from the truck to the pour section? Is this even feasible over a rebar mat? I don't want the rebar at the bottom of slab when it's all said and done. Is this something where I can leave out the chair supports except where it's being poured? Plywood over the rebar mat in the travel area? I'm not familiar with what you can or can't do with one of these buggies. Thank you.