Marctrees
Well-known member
We know that PB shops are constructed so the floor and building can move independently.
Assuming a well footed post install job, with a well compacted proper slab job, in a NON freezing Geo area, typical 30 x 40 shop -
Has anyone witnessed the slab or building moving in relation to each other considering the conditions listed above ??
Marc
Assuming a well footed post install job, with a well compacted proper slab job, in a NON freezing Geo area, typical 30 x 40 shop -
Has anyone witnessed the slab or building moving in relation to each other considering the conditions listed above ??
Marc



