Needing input. I am looking to build a shop 25x45ft with 20 ft sidewalls. Half of which will split into an upper and lower level 20x25, the other half (weight room on bottom, loft right above. The other half will be 20 ft high walls used for climbing rope and climbing walls. I plan to insulate eventually. Eventually want it fully insulated and concrete floors (no vehicle ever parked in it.
So, what would be the cheaper option, stick or pole? If pole, I know I'd have to frame for easy installation and also framed for some of posting up of walls for climbing. But I will need an engineer which could be $300-500.
Any input would be greatly appreciated. Most of what I've seen on forum is for 12-14ft sidewalls. Haven't seen much showing advantages of one or the other when building this tall.
Ultimately someone else will be building for me, just trying to figure what would be best option.
Any input is greatly appreciated!
So, what would be the cheaper option, stick or pole? If pole, I know I'd have to frame for easy installation and also framed for some of posting up of walls for climbing. But I will need an engineer which could be $300-500.
Any input would be greatly appreciated. Most of what I've seen on forum is for 12-14ft sidewalls. Haven't seen much showing advantages of one or the other when building this tall.
Ultimately someone else will be building for me, just trying to figure what would be best option.
Any input is greatly appreciated!