7th Kahuna
Well-known member
My dad is beginning the planning for a new shop building. Initially it will be 24' x 24' and later expanded to 24' x 36'. He is also seriously considering adding a second floor at that time and will build the initial structure with that in mind.
Presently we are considering the material for the walls. Because of concerns over security, we have largely excluded a stick built structure and are leaning toward either concrete masonry (CMU) or polystyrene formwork.
Polystyrene Formwork with Stucco Finish
CMU is pretty straight forward but I haven't done enough of it to really want to take the project on myself. Polystyrene looks like it would be easier for my father and I to do but I have never seen it installed outside of a handful of YouTube videos.
Does anyone here have experience with it? What do you think?
Is it as easy to install as it looks?
How does it compare, cost wise, to CMU?
Do any of the manufacturers provide engineering (ready made or site specific) for their product?
The project will be in Los Angeles County.
Thanks all. Answers to any of these questions is appreciated.
Presently we are considering the material for the walls. Because of concerns over security, we have largely excluded a stick built structure and are leaning toward either concrete masonry (CMU) or polystyrene formwork.
Polystyrene Formwork with Stucco Finish
CMU is pretty straight forward but I haven't done enough of it to really want to take the project on myself. Polystyrene looks like it would be easier for my father and I to do but I have never seen it installed outside of a handful of YouTube videos.
Does anyone here have experience with it? What do you think?
Is it as easy to install as it looks?
How does it compare, cost wise, to CMU?
Do any of the manufacturers provide engineering (ready made or site specific) for their product?
The project will be in Los Angeles County.
Thanks all. Answers to any of these questions is appreciated.
