Background: many moons ago I wanted to add some switches next to the door in my basement/garage (courtesy lights and 2 outdoor lights). I did 4" boxes in the ceiling, transitioning to thwn and conduit from there.
Somehow I measured wrong (or probably had a different plan back then) and now that I've added strapping the box depth is all wrong. This area is pretty much solid closed cell so moving boxes isn't an option.
Currently have a 1.5" extension on the boxes, one would just touch the drywall (mud ring would create a hump) and the other is crooked and hitting the drywall by 1/4-3/8".
Looks like pulling the 1.5" extension off would get me to needing about 2" total.
Suggestions?
Somehow I measured wrong (or probably had a different plan back then) and now that I've added strapping the box depth is all wrong. This area is pretty much solid closed cell so moving boxes isn't an option.
Currently have a 1.5" extension on the boxes, one would just touch the drywall (mud ring would create a hump) and the other is crooked and hitting the drywall by 1/4-3/8".
Looks like pulling the 1.5" extension off would get me to needing about 2" total.
Suggestions?