Thanks for all the responses guys, work is getting done but it's not as elaborate as when we were raising bents. The plywood for the roof is all up now. Gotta wait for the inspector to come by then we can start shingling.
We were able to work friday and saturday. Sunday we planned to start work on the loft floor, but it snowed and rained all day. I'm heading back to boston in about an hour, will come back down once we get the go-ahead to shingle. Most exciting thing to come up is once the roof is done were getting a backhoe back out here to dig for the slab and make the trench deeper. The old slab will finally come up when its here too.
No idea on the walls yet, although its looking more and more like its going to get a tarp treatment for a while until we can afford to do it right. Rigid foam insulation is pretty expensive, but its either that or SIPs (structural insulated panels).
Some pics as of 5 minutes ago:
We're starting to keep stuff in it already: