casper13
Member
I cut out 2 sections in my existing garage floor (6'x5') ea. and dug out old concrete and rock beneath it to get a proper depth for my 2 post lift. My question is do I put rock or something else down before the concrete, or can I pour directly on the earth? I stopped digging at 12" and it is still very easy digging, is that expected? Thanks in advance.
