I cut out 2 sections in my existing garage floor (6'x5') ea. and dug out old concrete and rock beneath it to get a proper depth for my 2 post lift. My question is do I put rock or something else down before the concrete, or can I pour directly on the earth? I stopped digging at 12" and it is still very easy digging, is that expected? Thanks in advance.
 
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!

ng8264723

Well-known member
Joined
Aug 28, 2006
Messages
732
Location
Oakham MA
It depends whayyou digging up. Is it sady fill? If so It's a good base for crete. It should be tamped though. A power tamper is best. If there is any topsoil it has to come out no organics
 
OP
C

casper13

Member
Joined
Apr 30, 2007
Messages
17
Location
Southern Illinois
Location is Southern Illinois, and I am digging topsoil. The existing pad is over the very same topsoil, but it does have 35" deep footings around the perimeter.
 