Hello,
I need to pour a lintel in place and all blocks will be core filled and I am following an engineered and approved plan when its comes to rebar layout etc. and it will be inspected.
I either plan to use leftover 2x6” or osb for the form.
Seems to be straight forward or are there things I need to be thinking about.
Here is a visual.

Thank you.
I need to pour a lintel in place and all blocks will be core filled and I am following an engineered and approved plan when its comes to rebar layout etc. and it will be inspected.
I either plan to use leftover 2x6” or osb for the form.
Seems to be straight forward or are there things I need to be thinking about.
Here is a visual.

Thank you.