I just picked up 6ml poly vapor barrier today along with 45 sheets of 2" blue board to go down before rebar and pex tubing.
My question is this:
Are you supposed to tape over the seems of the blue board after its down.?
If so what kind of tape? I plan to use duct tape on the vapor barrier.
Also I plan to put foam board around the inside perimeter before the floor is poured. What would you recommend doing for an 8x16 door. Insulate on the outside of the wall/footer or on top of the footing under the slab and call it good? There will be a footer poured, then 4' walls poured on top of that.
Thanks for the help
doc
My question is this:
Are you supposed to tape over the seems of the blue board after its down.?
If so what kind of tape? I plan to use duct tape on the vapor barrier.
Also I plan to put foam board around the inside perimeter before the floor is poured. What would you recommend doing for an 8x16 door. Insulate on the outside of the wall/footer or on top of the footing under the slab and call it good? There will be a footer poured, then 4' walls poured on top of that.
Thanks for the help
doc