Hey all! Looking for some advice on getting my shop floor set up for radiant heat. The shop size is 36'X40'. I have the insulation all laid down with 6 mil vapor barrier underneith. I also have 4'X8' sheets of 6"X6" mesh laid down on top if the insulation. I have recieved various opinions and would like to hear what you all here have to say.
I have 1500 ft of 1/2" PEX (Oxypex by BOW) in 3 X 500 ft rolls. How should I start laying this stuff out? I would like to have the manifolds in the SE corner under a set of stairs that goes to the second story. I have two 10' roll up doors and one man door on the south wall, one window on the east wall, a window and man door on the north wall and nothing on the west wall as the barn part of the building is on the other side of the west wall.
I was thinking of running a loop from the manifold in the SE corner heading west along the south wall were the two big doors are then heading north up along the wall that separates the shop and barn then heading east along the north wall making this loop and all loops 250'. Don't know if this is the way I should run it.
Should I tie the sheets of mesh together or not? Should I place the outside loop 12" away from the outside walls then place the next two tubes 6" apart and then space the rest of the tubes 12" apart as I move towards the center of the room?
I have a Bear B-52 car lift that is rated at 8000 lbs. It is the same model as the Hydra-Lift 28 that is still in production. It has a base that bolts to the floor and the two uprights bolt to it. You drive over a hump in the middle which covers the cables. Should I remove the insulation where the hoist is going to go to increase the thickness of the concrete where the hoist is going to go?
I am putting down 4" of 4500 psi (32 mpa) concrete every where but will have 5 3/4" of concrete where the hoist is as that is how thick the insulation panels are. I am using cut outs from exterior doors for insulation. They are 22"X36" metal on both sides and are R15.
Last question. I plan on tieing the PEX to the mesh. Do I leave the mesh and PEX at the bottom of the slab or do I pull it up as it is being poured so that it will be in the middle of the slab?
Any and all help is greatly appreciated.
Cheers!
Sid
I have 1500 ft of 1/2" PEX (Oxypex by BOW) in 3 X 500 ft rolls. How should I start laying this stuff out? I would like to have the manifolds in the SE corner under a set of stairs that goes to the second story. I have two 10' roll up doors and one man door on the south wall, one window on the east wall, a window and man door on the north wall and nothing on the west wall as the barn part of the building is on the other side of the west wall.
I was thinking of running a loop from the manifold in the SE corner heading west along the south wall were the two big doors are then heading north up along the wall that separates the shop and barn then heading east along the north wall making this loop and all loops 250'. Don't know if this is the way I should run it.
Should I tie the sheets of mesh together or not? Should I place the outside loop 12" away from the outside walls then place the next two tubes 6" apart and then space the rest of the tubes 12" apart as I move towards the center of the room?
I have a Bear B-52 car lift that is rated at 8000 lbs. It is the same model as the Hydra-Lift 28 that is still in production. It has a base that bolts to the floor and the two uprights bolt to it. You drive over a hump in the middle which covers the cables. Should I remove the insulation where the hoist is going to go to increase the thickness of the concrete where the hoist is going to go?
I am putting down 4" of 4500 psi (32 mpa) concrete every where but will have 5 3/4" of concrete where the hoist is as that is how thick the insulation panels are. I am using cut outs from exterior doors for insulation. They are 22"X36" metal on both sides and are R15.
Last question. I plan on tieing the PEX to the mesh. Do I leave the mesh and PEX at the bottom of the slab or do I pull it up as it is being poured so that it will be in the middle of the slab?
Any and all help is greatly appreciated.
Cheers!
Sid