Well I finally finished trimming out the OHD openings inside and out. Doors are in and scheduled for installation this coming Monday.
I also go the eve vents and trim in, and closed in the bottom of the pent roof, so the bats are going to have to have their parties somewhere else. All trim has a coat of primer and one coat of finish.

I got the sub panel powered up last night and hope to have a couple circuits wired for power outlets to the doors and on the walls.

I hope to get the man door installed this weekend as well.... so after Monday I should be able to secure the garage properly.
I even got my lovely wife and MIL to stain clapboards and have enough on hand to finish two walls.
So now I have to decide on a trajectory.... should I....
Option 1: double down on finishing the trim and getting as much siding up as I can before the weather turns? (it's mid-October already and this is in Maine... so I can expect snow any time after Thanksgiving). This option uses the warm weather for painting trim boards.
or...
Option 2: resign myself to getting through he winter with just the house wrap up, and shift gears to finishing the rough wiring, insulating and getting the ceiling strapped and sheet-rocked, so that I can get my LED fixtures installed. This option uses the warm weather for mudding and taping the rock and painting the ceiling.
Budgetary constraints are dictating that I can't sub any of this out... so it's just me and every once and a while a Saturday helper (young guy from church who had his hours cut at work).
Well I finally finished trimming out the OHD openings inside and out. Doors are in and scheduled for installation this coming Monday.
I also go the eve vents and trim in, and closed in the bottom of the pent roof, so the bats are going to have to have their parties somewhere else. All trim has a coat of primer and one coat of finish.

I got the sub panel powered up last night and hope to have a couple circuits wired for power outlets to the doors and on the walls.

I hope to get the man door installed this weekend as well.... so after Monday I should be able to secure the garage properly.
I even got my lovely wife and MIL to stain clapboards and have enough on hand to finish two walls.
So now I have to decide on a trajectory.... should I....
Option 1: double down on finishing the trim and getting as much siding up as I can before the weather turns? (it's mid-October already and this is in Maine... so I can expect snow any time after Thanksgiving). This option uses the warm weather for painting trim boards.
or...
Option 2: resign myself to getting through he winter with just the house wrap up, and shift gears to finishing the rough wiring, insulating and getting the ceiling strapped and sheet-rocked, so that I can get my LED fixtures installed. This option uses the warm weather for mudding and taping the rock and painting the ceiling.
Budgetary constraints are dictating that I can't sub any of this out... so it's just me and every once and a while a Saturday helper (young guy from church who had his hours cut at work).