Shop/Pool
Got a call from Mueller buildings and was told other than a few boxes of screws that they have everything ready to ship to me. I am more than excited about that. Having to assemble it in August in Texas? Not as excited...
Concrete work is well underway. The team started last week and while they measured slope and got an estimate, I don't think they were anticipating the pool company to set the deck height as up where it was. To be fair my wife wasn't either. She got one look at where the slab was going sit and had a freak out moment. Our goal has been from the beginning that this would not be a neighborhood eyesore and this is pushing it. Like everything on this project, we will figure it out.
Anticipated pour date was Friday but will be pushing it off so I can learn how to spell, then do plumbing rough-in.

First load

Forms starting to go up. As you can see there is about to be a lot of dirt delivered.

With the unanticipated height, I realized that I was going to have to do a slight modification. The Green was where I was planning on adding a walk door which I would have to climb into. I am going to have them pour a walkway when they do the driveway next. Also looking at him adding an additional small pad to hold compressor and dryer outside of shop space. Just don't want to sacrifice the square footage and noise.

Up to date with today. This is approximately 20 trucks of fill down, another 9 to go. Supposedly will be done with fill work by tomorrow and then I can get to work.
Got a call from Mueller buildings and was told other than a few boxes of screws that they have everything ready to ship to me. I am more than excited about that. Having to assemble it in August in Texas? Not as excited...
Concrete work is well underway. The team started last week and while they measured slope and got an estimate, I don't think they were anticipating the pool company to set the deck height as up where it was. To be fair my wife wasn't either. She got one look at where the slab was going sit and had a freak out moment. Our goal has been from the beginning that this would not be a neighborhood eyesore and this is pushing it. Like everything on this project, we will figure it out.
Anticipated pour date was Friday but will be pushing it off so I can learn how to spell, then do plumbing rough-in.

First load

Forms starting to go up. As you can see there is about to be a lot of dirt delivered.

With the unanticipated height, I realized that I was going to have to do a slight modification. The Green was where I was planning on adding a walk door which I would have to climb into. I am going to have them pour a walkway when they do the driveway next. Also looking at him adding an additional small pad to hold compressor and dryer outside of shop space. Just don't want to sacrifice the square footage and noise.

Up to date with today. This is approximately 20 trucks of fill down, another 9 to go. Supposedly will be done with fill work by tomorrow and then I can get to work.