I had my Bendpak lift installed last night and am looking to confirm the proper wiring for this application. It uses a 240v 1phase 2 hp motor drawing ~10A.
The electricians provided for a 240v junction box ~13' off the ground in the "pocket" encompassing the lift columns.
The hydraulic pump is located ~4' off the ground on the column on the opposite side of the provided junction box.
My questions are;
1. Is it proper/to code to "hardwire" the motor to the provided box? That is, should there be a plug at the motor or at the box so it can be disconnected? I dont see any practical reason to turn it on/off and it has its own dedicated circuit from the main panel.
2. If "hardwiring" is acceptable, would 12-2 BX be proper? What are the requirements for securing the BX (or other cable) to the lift and to the building structure?
I may have more questions but help on those would be great.
Thanks
The electricians provided for a 240v junction box ~13' off the ground in the "pocket" encompassing the lift columns.
The hydraulic pump is located ~4' off the ground on the column on the opposite side of the provided junction box.
My questions are;
1. Is it proper/to code to "hardwire" the motor to the provided box? That is, should there be a plug at the motor or at the box so it can be disconnected? I dont see any practical reason to turn it on/off and it has its own dedicated circuit from the main panel.
2. If "hardwiring" is acceptable, would 12-2 BX be proper? What are the requirements for securing the BX (or other cable) to the lift and to the building structure?
I may have more questions but help on those would be great.
Thanks