DC73
Well-known member
Just finished the first coat of Rust Bullet on my workshop floor and now waiting for it to cure so I can put down the 2nd coat and flakes.
Questions: How large of an area did you cover with the 2nd coat before putting down the flakes? Would you do it differently if you had to do it again?
Wondering if I could get by with 250 sq. ft. or if it would be better to work with smaller areas. It'll take me about 40 minutes for each 250 sq. ft. The humidity is in the 45 to 55% range.
Thanks much,
DC
Questions: How large of an area did you cover with the 2nd coat before putting down the flakes? Would you do it differently if you had to do it again?
Wondering if I could get by with 250 sq. ft. or if it would be better to work with smaller areas. It'll take me about 40 minutes for each 250 sq. ft. The humidity is in the 45 to 55% range.
Thanks much,
DC