In my search for sites on advice for building a detached garage, I stumbled across this wonderful forum. My wife and I recently put in an offer on a house just outside of Charlotte, North Carolina, and are now in contract. The house has an attached two car garage but I have always dreamed of having my own "man castle". After spending countless hours in the garage gallery thread, I really liked the build from dave67fd (http://www.garagejournal.com/forum/showthread.php?t=102939). His garage was 28 x 38 x 10 with a full dormered loft and turned out great. Depending how much it will cost, I have plenty of room for a 30 x 40.
The house we are buying is on a nice and flat acre on the end of a culdesac. The neighborhood doesn't a CCR but I have to adhere to the county's restrictions. I plan on calling them next week to find out what the restrictions are.
This is my first attempt at building anything so it is completely new territory. I plan on hiring out for most of the work but will consider doing any of it that I reasonably can.
1) Because cash is limited with our pending closing, what are recommended building phases? For example, should I have the foundation, frame, exterior, and roof done all at the same time? That looks like the biggest chunk of change for the project.
2) The lot is really flat so I hope the foundation costs are reasonable. What is a ball park cost per square foot for a foundation? I plan on getting multiple quotes but I have not basis of comparison.
3) Is it a problem to have electricity ran to the garage later or should I have that done during the initial building phase?
I'm sure that there are tons of other questions I will have down the road. I'm just a little overwhelmed with everything right now but I'm really looking forward to the end result of this project.
Thanks in advance for any advice you guys can offer.
The house we are buying is on a nice and flat acre on the end of a culdesac. The neighborhood doesn't a CCR but I have to adhere to the county's restrictions. I plan on calling them next week to find out what the restrictions are.
This is my first attempt at building anything so it is completely new territory. I plan on hiring out for most of the work but will consider doing any of it that I reasonably can.
1) Because cash is limited with our pending closing, what are recommended building phases? For example, should I have the foundation, frame, exterior, and roof done all at the same time? That looks like the biggest chunk of change for the project.
2) The lot is really flat so I hope the foundation costs are reasonable. What is a ball park cost per square foot for a foundation? I plan on getting multiple quotes but I have not basis of comparison.
3) Is it a problem to have electricity ran to the garage later or should I have that done during the initial building phase?
I'm sure that there are tons of other questions I will have down the road. I'm just a little overwhelmed with everything right now but I'm really looking forward to the end result of this project.
Thanks in advance for any advice you guys can offer.