Construction has begun! The framers showed up yesterday morning. The goal for yesterday was to get the decking framed out, because spray foam was scheduled for Friday (today). Typically, they can spray the joists from the underside at any time during the project, but in my case, they don't have the clearance to spray from the underside... so they're going to do it from the top before the subfloor goes in. This meant that they had to contain the spray foam from the underside somehow, so the solution was to install a 2x4 cleat to the bottom of each floor joist, and drop in a piece of foam board from the top. They also ran a 2x6 across the top of the joists to keep them from bowing at all in case the spray foam were to expand with enough force to shift the joist position.
We spent a lot of time calculating out the exact placement of the finished floor, so that I could maintain the one step down into the garage I wanted. When all was said and done, it turns out I had plenty of clearance underneath to put the gravel down that I wanted to do... oh well. I can still get at the first couple feet under each side, and of any water were to run under the addition, this is where it would permeate the ground anyways, so I think I can still achieve what I wanted to do.
Overall I am happy so far. I can get a sense of the size of the room now that the decking is down, and I think it's going to be a great space.
This funky area where the stone juts out in front of the addition will be removed to open it up. For a few different reasons, I decided to put the door on the left side closer to the house, and the window on the right. I'll probably end the flower bed even with the end of the house. Someday, I want to do a paver front walkway that will extend into the area of the addition. For now, I may just put some pavers down in the area, or build a small cheap ground level PT deck/platform until that day comes.
We spent a lot of time calculating out the exact placement of the finished floor, so that I could maintain the one step down into the garage I wanted. When all was said and done, it turns out I had plenty of clearance underneath to put the gravel down that I wanted to do... oh well. I can still get at the first couple feet under each side, and of any water were to run under the addition, this is where it would permeate the ground anyways, so I think I can still achieve what I wanted to do.
Overall I am happy so far. I can get a sense of the size of the room now that the decking is down, and I think it's going to be a great space.
This funky area where the stone juts out in front of the addition will be removed to open it up. For a few different reasons, I decided to put the door on the left side closer to the house, and the window on the right. I'll probably end the flower bed even with the end of the house. Someday, I want to do a paver front walkway that will extend into the area of the addition. For now, I may just put some pavers down in the area, or build a small cheap ground level PT deck/platform until that day comes.