I started this addition on the 4th of July in 2013. I’ll let the pictures do most of the talking, but in short, I added approximately 1700 sq ft to my existing house, which was approximately 2000 sq ft to start. The garage is about 21’ wide x 32’ feet deep with a 10’x14’ loft above it. The addition took 4 variances for approval, and now puts me at 50% impervious surface for my lot.
I had previously opened up the floor plan downstairs in the house, essentially eliminating 2 of the 4 bedrooms(1950's built home). With thoughts of a 2nd kid, we had to either move, or add on. The housing market sucked and we stood to loose money selling our house. So we scraped all of our money together and went for it. With my experience on prior projects and connections to friends in various construction fields who I could reference, I decided to take on the entire project myself, with the exception of the additional foundation and slab work, and help from a friend and his crew to knock out a large portion(but not all) of the framing. The rest I did on nights and weekends... including the design and drawings, finishing a good bit of framing, installing the windows, flashing, capping, siding, roofing, pier footings, all electrical, plumbing, relocating the heater, all new supply plumbing to the original kitchen and baths, insulation, drywall, spackling, painting, flooring, trim, and a few other unique customizations along the way. It will never be done, but this thread is how I plan to share my adventure.
The start:
The Vision:
I had previously opened up the floor plan downstairs in the house, essentially eliminating 2 of the 4 bedrooms(1950's built home). With thoughts of a 2nd kid, we had to either move, or add on. The housing market sucked and we stood to loose money selling our house. So we scraped all of our money together and went for it. With my experience on prior projects and connections to friends in various construction fields who I could reference, I decided to take on the entire project myself, with the exception of the additional foundation and slab work, and help from a friend and his crew to knock out a large portion(but not all) of the framing. The rest I did on nights and weekends... including the design and drawings, finishing a good bit of framing, installing the windows, flashing, capping, siding, roofing, pier footings, all electrical, plumbing, relocating the heater, all new supply plumbing to the original kitchen and baths, insulation, drywall, spackling, painting, flooring, trim, and a few other unique customizations along the way. It will never be done, but this thread is how I plan to share my adventure.
The start:
The Vision:
























I decided to move it to the garage so I could harness it's heat a lot easier, have more room to work on it, and it was still close enough that I wouldn't have wait times for hot water to reach the far parts of the house. since I was moving it, I needed a temporary hot water supply because we were living in the house during construction and still obviously needed hot water. I got the electric 30 gallon from a plumber buddy who had recently pulled it from a customers home. it still worked obviously, so I plumbed it in temporarily and wired it to the closest welder outlet I had in the garage.