Hey all,
I’m working on a buddy’s attached garage after he asked me to replace a rotting trim with PVC. Started getting into it and the 2x12 header with 1/2”OSB center needs replaced. I bought two 2x12x20’ , 1/2” OSB and then Zip Wall board to replace the Celotex board. Given that the trusses run left to right, how much support do I need above the header while I replace ? I was going to cut out more of the Celotex
And then run 2x4across the cripples then support that with a downward 4x4. Thoughts?
Sent from my iPhone using Tapatalk
I’m working on a buddy’s attached garage after he asked me to replace a rotting trim with PVC. Started getting into it and the 2x12 header with 1/2”OSB center needs replaced. I bought two 2x12x20’ , 1/2” OSB and then Zip Wall board to replace the Celotex board. Given that the trusses run left to right, how much support do I need above the header while I replace ? I was going to cut out more of the Celotex
And then run 2x4across the cripples then support that with a downward 4x4. Thoughts?
Sent from my iPhone using Tapatalk

Attachments
Last edited: