Mainiac Mat
Well-known member
Is there any standard or limit on the hole size drilled into studded walls for running circuits with Romex?
I know you're not supposed to piggy back Romex under staples (unless you use the special stacker clips) and I assume this has to due with heat dissipation in cables when they **** near max amperage allowed in the circuit.
So it has me wondering how tightly I can pass Romex runs through the studs.
I drilled 3/4" dia. holes and now am going to need to run more separate circuits through there than originally planned (2 @ 12-2 and 1 @ 14-2 and 1 @ 14-3).
Do I need to drill another set of holes offset from the first, or can am I good to go stuffing them all through the 3/4" holes.
I know you're not supposed to piggy back Romex under staples (unless you use the special stacker clips) and I assume this has to due with heat dissipation in cables when they **** near max amperage allowed in the circuit.
So it has me wondering how tightly I can pass Romex runs through the studs.
I drilled 3/4" dia. holes and now am going to need to run more separate circuits through there than originally planned (2 @ 12-2 and 1 @ 14-2 and 1 @ 14-3).
Do I need to drill another set of holes offset from the first, or can am I good to go stuffing them all through the 3/4" holes.