zkdiesel
Well-known member
What are you guys using to save rotted off
Posts? Buildings been rettined once but now poles all shot
Poles
Measure a true 6”. Anybody have a solution other than our home brew idea that we are going to try?
Plan is to sleeve them in 20” metal at the base, weld rebar sticking out 3 directions to each once, through bolt metal through upper part of good wood, then Pour concrete slab trapping the rebar and the sleeve in concrete to retain it
Barely anything holding it up at this point at the 50 year mark and it hasn’t fallen down in the microburst we had this spring, so this should be a big upgrade
Posts? Buildings been rettined once but now poles all shot
Poles
Measure a true 6”. Anybody have a solution other than our home brew idea that we are going to try?
Plan is to sleeve them in 20” metal at the base, weld rebar sticking out 3 directions to each once, through bolt metal through upper part of good wood, then Pour concrete slab trapping the rebar and the sleeve in concrete to retain it
Barely anything holding it up at this point at the 50 year mark and it hasn’t fallen down in the microburst we had this spring, so this should be a big upgrade
Attachments
-
4D3415D7-8C61-4EB5-90F5-4EE92097493B.jpg151.6 KB · Views: 633 -
46BC5D15-9701-43BD-A2E9-8B619657E74D.jpg152.5 KB · Views: 669 -
02A5F132-A339-4386-BFF9-83ECDC7675A9.jpg86.5 KB · Views: 624 -
D3C14319-8DA4-4D65-A3BE-813C3380E1AB.jpg148.5 KB · Views: 558 -
8289EBA7-FD33-484E-949D-5D3B4175108F.jpg148.7 KB · Views: 537 -
9FE8EC2D-B665-4789-BD26-A180EF02A16E.jpg123.6 KB · Views: 545