67srdeluxe
New member
- Joined
- Oct 13, 2010
- Messages
- 4
I'm getting a heat for the garage put in. The fuse panel is located at a lower portion of our house. That being said the wiring has to be run down to the panel through our unfinished storage area. The individual doing the wiring is routing the 220 wiring and securing it in some places with zip ties to copper pipes. Is that OK or should the wiring be run through the floor joist? I sure could use some help as this is new to me.
.