I know this topic has likely been covered in depth in the past, and I also know the correct and proper (and only!) method is to solicit the quotes of a licensed electricians, but I do want to have some ammo before that conversation even starts.
My in-laws have a SqD QO split bus (yes, really) main service panel in their garage, likely original to the 1970s build of the house. There are a few slots left available at the bottom of the panel (and one set of 240VAC at the top before the split). My concern is adding any more circuits will snowball into something more, so my thought is start with a modern panel with more spaces to begin with and branch from there.
My in-laws have a SqD QO split bus (yes, really) main service panel in their garage, likely original to the 1970s build of the house. There are a few slots left available at the bottom of the panel (and one set of 240VAC at the top before the split). My concern is adding any more circuits will snowball into something more, so my thought is start with a modern panel with more spaces to begin with and branch from there.
- I know NEC 2020 now requires an outside disconnect ahead of the inside panel, does this also apply to retrofits?
- Same with AFCIs, also required if only changing the panel and not touching anything downstream or adding?
- Any rough ideas on cost?
- Anything else I am forgetting or should be aware of?