Well-known member
Hey Folks,
I'm trying to decide what is going to be the best route to take as I finish off my 24x35 shop with insulation and sheetrock. Right now, the shop has 10' ceilings and trusses on 24" centers and its completely open. I want to install 9 outlets in the ceiling for plug in style LED 4' lights. I'll do blown-in insulation and sheetrock the ceiling. My question is on the order of events.
Should I run the electrical and attach the boxes prior to doing the sheetrock (meaning I'll have to mark and cut the sheetrock and take lots of ceiling measurements), or should I sheetrock the ceiling, and come from above, and cut and install my boxes from the top?
I'll be doing the sheetrock myself, with a sheetrock lift but want to be as efficient as possible.
Thanks!
-Nick
I'm trying to decide what is going to be the best route to take as I finish off my 24x35 shop with insulation and sheetrock. Right now, the shop has 10' ceilings and trusses on 24" centers and its completely open. I want to install 9 outlets in the ceiling for plug in style LED 4' lights. I'll do blown-in insulation and sheetrock the ceiling. My question is on the order of events.
Should I run the electrical and attach the boxes prior to doing the sheetrock (meaning I'll have to mark and cut the sheetrock and take lots of ceiling measurements), or should I sheetrock the ceiling, and come from above, and cut and install my boxes from the top?
I'll be doing the sheetrock myself, with a sheetrock lift but want to be as efficient as possible.
Thanks!
-Nick