Shingle time per sq

To avoid these ads, REGISTER NOW!

Streetbu

Well-known member
Joined
Jan 7, 2014
Messages
3,082
Location
Central NY
With a gun, but not having done it before, I would say closer to an hour or two after its prepped. I did my last house, was 33 squares. I understood how to do it, my buddy came over that did it for a living, showed me and got the first row started. Once you get going you will pick it up quick.
 

Toomanytools?

Well-known member
Joined
Nov 4, 2010
Messages
855
Location
Washington
On a ranch, what is the time to lay a square? I realize I is a guess but there must be some numbers a guy knows.

It's about the same time as banging a ***** in the city. :lol_hitti
Ha once everything is ready and laid out, even nailing by hand 20 minutes on a slope not greater than 5/12.
Everyone is different but still 30 minutes easy.
 

T_R

Well-known member
Joined
Jul 2, 2015
Messages
902
Location
Maine
I did my garage last weekend. 7.5 square of 3 tab on 4/12 took me 2 full days of work and a few hours another day after I ran short of shingles. I'm not a roofer and it was 89 degrees out probably 100+ on the roof so lots of breaks. This is with a gun but just a cheap harbor freight one that sorta works.
 

Kpaige

Well-known member
Joined
Aug 12, 2015
Messages
751
Location
Big Lake Minnesota
3 to 4 sq per hr with a gun on a 6/12 or shallower. My crew of 5 can do 60 square per day tear off and install working 12 hr days. That includes everything through clean up and driving the dump trucks away. Of course deck type, condition ect all plays a part.
 
To avoid these ads, REGISTER NOW!

readhead

Well-known member
Joined
Dec 8, 2012
Messages
6,189
Location
Durango, Co.
You asked and we answered. A square is only 10'x10'. Three bundles. Of course things will slow down when you get to valleys and detail work.
 

Falcon67

Well-known member
Joined
Jun 11, 2009
Messages
18,371
Location
Merkel, TX
As above. When I did my shop, I'd say 20~30 per three bundles with a nailer, maybe quicker. Once you get the first row on and the exposure gauge set, you can just punch along. Line up one end, boom, space other, boom, boom, boom, next shingle, repeat. You lose time moving bundles, cutting open, chasing ones sliding off or blowing away, etc.
 
Last edited:

tac

Well-known member
Joined
Sep 2, 2015
Messages
69
Location
Colleyville Texas
When I did my garage roof they charge a little extra to put them up on the roof. Was well worth it. Saved a lot of ladder time.
 
OP
S

sberry

Banned
Joined
Jun 18, 2005
Messages
35,747
Location
Brethren, Michigan
I had a bunch of detail and start work so it killed my time. A real speed demon with the perfect layout might be able to do it in 30 mins.
 

6768rogues

Banned
Joined
Nov 28, 2007
Messages
4,524
Location
Western NY
I would figure about an hour per square. That includes time to put down underlayment, drip edge, rake edge, cut shingles at ends, moving shingles to where you need them, etc. Simply laying shingles after all the prep is done is faster, as stated above.
 

Seppala

Well-known member
Joined
Sep 2, 2014
Messages
723
Location
North Fork of Long Island, N.Y.
I did my garage last weekend. 7.5 square of 3 tab on 4/12 took me 2 full days of work and a few hours another day after I ran short of shingles. I'm not a roofer and it was 89 degrees out probably 100+ on the roof so lots of breaks. This is with a gun but just a cheap harbor freight one that sorta works.

That 7.5 square of 3 tab on a 4/12 pitch roof took me 4 days. I also had a cheap HF gun but did a total tear off and replaced rotted roofing plywood. I had beautiful clear 55 degree days but a 57 year old body.
 

T_R

Well-known member
Joined
Jul 2, 2015
Messages
902
Location
Maine
That 7.5 square of 3 tab on a 4/12 pitch roof took me 4 days. I also had a cheap HF gun but did a total tear off and replaced rotted roofing plywood. I had beautiful clear 55 degree days but a 57 year old body.

I'm 43 and starting to slow down some too.

It took me 2 days to haul the osb sheathing up there and nail it down by hand. It was ungodly hot for Maine that weekend too. Mid 80's with upper 80's humidity.

So about the same time wise.
 

KenC

Well-known member
Joined
Dec 20, 2009
Messages
2,598
Location
oklahoma
I did about 15sq, 2 hips, 2 valleys, arch'l shingles & ridge cap last spring, good gun.. Shingles on the ground, carried to roof top, took two days, about 14 hrs total. I'm 72!
 

oldmxracer

Well-known member
Joined
Jan 29, 2006
Messages
1,204
Location
Ohio
I did about 15sq, 2 hips, 2 valleys, arch'l shingles & ridge cap last spring, good gun.. Shingles on the ground, carried to roof top, took two days, about 14 hrs total. I'm 72!

You did great !

Doing a roof is hard bust *** WORK Ya got to put on Your big girl ******* when, You do one !

I have done hundreds of them in My 62 years on gods green earth!
 