Shop build 56 x 72 x 16

Status
Not open for further replies.
To avoid these ads, REGISTER NOW!
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
Concrete questions! Anyone pour things into their floors? Any concrete guys have input? As stated earlier I will have a skim of gravel then foam and radiant heat in the floor and it will all be 6" thick with 3'x3' 12" thick pads for 2 post lifts..

- I was thinking of having something in the floor in front of my main lift bay to winch to. That way I can drag in non running vehicles.
-Also thinking about pouring I beams level with the floor in an area to use as a frame jig/table, for fabricating frames and other things.
-I want to run electric and air in the floor rather than overhead drops, outlets on lifts and in the spots where I will have machines and work benches. I am guessing running that under the insulation would be best? Should it be in the gravel, in the dirt? What kind of conduit, PVC?
-Any info on coatings would help too. Haven't searched for that yet but I will be wanting to protect the floor.
 

purediesel

Well-known member
Joined
Apr 17, 2016
Messages
193
Location
Ada Oh
I've seen people sink in 2" receivers so you can tie a winch plate to that to pull things in. I was going to but with owning a tractor and 4 wheeler there is plenty of ways to get a dead vehicle in the shop. Plus with the heated floors I didn't want anything around the coils. For the 2 post lift I left 2'x2' area without any heating coils, 1' OC rebar and entire shop is at 6" thick. 12" is way overkill and frankly a waste of money. Look at the lift manufactures installation requirements and you'll find most are 4" min with 6" recommended. The electrical in the floor wouldn't be a problem but I wouldn't run the air. The air line in the floor would be a low leg for condensate to collect, especially when its humid out and the concrete is cool. You'd need some sort of dryer/separator setup at each location when it comes out of the floor. Awesome build, wish I had the money to do it this way but I didn't so pole barn it was. Oh, be sure to do a proper class A vapor barrier, definitely worth the money.
 
Last edited:

HWH2017

New member
Joined
Apr 16, 2017
Messages
4
Location
Michigan
X2 on quality vapor barrier and rebar. I used 6” of concrete as was specified by the 12k 2- post lift I put in. Had the lift location determined so not to run the radiant under the lift columns. I placed conduit run 10f6a6f76d4a360b693d6d170bb6a15e.jpg85bd154fd6d7408c814dce153aee907b.jpgunder the slab for power to the lift and pulled an extra circuit for 120V power at the lift. Finally got my rapid air kit put up and ran a ceiling drop to the lift.


Sent from my iPhone using Tapatalk
 

Attachments

  • 10f6a6f76d4a360b693d6d170bb6a15e.jpg
    10f6a6f76d4a360b693d6d170bb6a15e.jpg
    53.5 KB · Views: 1
  • 85bd154fd6d7408c814dce153aee907b.jpg
    85bd154fd6d7408c814dce153aee907b.jpg
    58.1 KB · Views: 1

MattN03

Well-known member
Joined
Nov 4, 2007
Messages
601
Location
KY
First thing, first. Have a survey done and official property lines mapped out. While the neighbor may be cool with it today, what happens when he sells/dies and the new neighbor isn't. I had my property surveyed for $625 dollars. I am about $25k into the garage build, whats $625?

Other than that, I have no advice. Beautiful looking country, wish you luck.

This is EXCELLENT advice. I made the mistake of thinking I knew where the boundaries were and built my shop. When everything but the garage doors were installed, the neighbor showed up saying we'd built on his land. It's an overgrown wooded lot that he doesn't do anything with and lives 2 counties away. I paid to have a survey done and sure enough nearly 20' of the shop was on his land. Fortunately, he was reasonable with us, and after I picked all the survey & legal fees and gave him $1000 cash and the same amount of land back in another adjoining piece of our property, we settled and got to keep the shop in the location. He could have made us tear it down, so we were very fortunate and grateful that it worked out the way it did.

Our lesson learned, ALWAYS get a survey, even if you *think* you know where the lines are.
 
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
I am doing a vapor barrier under the foam i forgot to mention that. I was told 12" by someone but, you're right after doing some looking myself 6 1/2" with rebar is good for 12k and 15-18k they recommend 8" with rebar. So I'll probably just do 8" in case I get real big lifts someday. I do have a bobcat and trucks but I'm building everything with the what if attitude Haha. I'm looking for advice on how to make a good winch setup that won't crack my floor of anyone's ever done something real heavy duty. I wasn't thinking about the water with air lines. That is a good point. I would have to slope everything and have a drain. If I did that then...
 
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
Been really busy between overtime at work and moving out of my old garage before I originally planned to. Having a bobcat sure helped the move. View media item 97912View media item 97911Decided to go with these Menards high bay LEDs. Little over 22,000 lumens and dimmable. Buying a couple at a time, got one so far. I'll be doing around 15 total I'm thinking.
View media item 98430Also decided to change the layout a little bit. The main change is the second lift orientation. I realized it would really **** to get a car on the lift where I have it before. View media item 98433
 

imjustdave

Well-known member
Joined
Apr 9, 2014
Messages
204
Location
Sumner WA
good lord this is a big shop, consider yourself lucky with the low code requirements, around here you would need a bunch of rebar, earthquake strapping at every corner and opening... this lists goes on.
Windows?
I'm debating windows myself as the issue I see is another way for a thief to get in, but natural light is hard to pass up.

So were those 2X8 16 long?
Any reason you used CMU VS a poured wall?
you have plans or just using standard methods?

For your floor .. I know your still a long way away.. I was looking at these people
https://www.amvicsystem.com/products/ampex/
no experience yet but I might use them. biggest thing for me is considering the $$ factor of heating skimping out on the insulation doesn't seem smart so engineered for me.

Also I'm envious and looking good, keep it up.
 
To avoid these ads, REGISTER NOW!
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
imjustdave
Thanks, it would be even bigger right now if I could! I'll add a storage building to it someday.
-No windows, Ill be doing 12-15 high bay leds 22,000 lumens each
-Walls are 2x6 and yes 16' ceiling
-I didn't have engineered plans, just ideas in my head, lots of research, and friends that do construction.
-For the floor I'm doing 2" foam insulation under and on the sides of the whole slab, vapor barrier, 6" thick and 8" where lift post are.
 
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
So through the winter I have made some progress. Got all the steel on. Ended up paying an Amish crew to do that. They had the whole thing done in two days! Did a vapor barrier bubble wrap stuff under the roof. Vented soffit on the long sides. Ridge vent the length of the roof. Charcoal gray and black. I love the way it looks so far!
View media item 102189View media item 102187View media item 102186Did 6" seamless aluminum gutters with four downspouts, one on each cornerView media item 102190Had to pay an electrician(per code) to run the wire from the pole, install the meter base, breaker panel and an outlet. Ran it underground in conduit.
View media item 102188
 
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
Anyone have input on garage doors? That's what's next. So far the best quote is clopay brand doors, 2" thick they claim R value of 18.4 I'm doing high lift tracks(closer to the ceiling) and jackshaft mounted openers. Plain white no windows or patterns. Between the panels they have a seal and it's tongue and groove

Two 14'x14' and one 10'x14'

3721 is the model I'm considering, and it's through accurate door in north canton
https://www.clopaydoor.com/insulated-polyurethane-doors
 
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
I wrapped the door frames where the tracks go with steel. I'm really picky haha couldn't leave it bare or paint it and didn't wanna have to mess with doors again later
View media item 107651
Temporarily hung 5 lights. Very happy with how bright it is already. Gonna have 12-15 when I'm done. The garage door guys rented that platform lift, so since it was there I used it all night once they left!
View media item 107654
 
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
Wired up a 100 amp sub panel diagonally across from the main 200 amp

View media item 111902I'm still doing radiant heat, but until that's running I got a 250,000 btu Clean Burn brand waste oil burning furnace. It will run on motor oil, hydraulic, atf, and fuel oils. It's impressive. This past winter 25° outside I had the building up to 60°. Dirt floor, no insulation, ridge vent and soffets venting. Very happy with itView media item 111903
 

kberjian

Well-known member
Joined
Jun 1, 2016
Messages
258
Location
Calgary
Looking good. Are you doing a consistent slab thickness all the way through? Or just thicker spots for the lifts and heavy machining tools?

I forgot a few things when I did my slab like a floor drain and conduit to the lift. Just something to think about.

Love the size, lots of room for activities!
 
OP
@

@scottystephenss

Active member
Joined
May 30, 2017
Messages
43
Location
Minerva OHIO
kberjian: Thanks! Yea, it will be 6" everywhere. I'm planning on two 2 post car lifts, so pads for those spots will be thicker, probably 8" and I am planning on running conduit for air and electric to the two lifts. . Then one other spot I am planning a Jib crane so I will need a thicker pad there. Not sure what I need to do for that yet. I do have floor drains planned out as well
 