iceman5
Active member
My fiancee and I relocated to PA last year. We actually closed on our house Christmas Eve day. After a year of permitting reviews for the driveway, rennovations on the 30x40 pole building finally started this spring. Here's what I'm starting with.
The plans are:
1. Install a driveway to get back to the shop.
2. Get electric and water from the house. No sewer, I just want to be able to wash and detail cars down there.
3. Pour concrete floor
4. Finish the interior
Finally I have a place to play with my toys!
The plans are:
1. Install a driveway to get back to the shop.
2. Get electric and water from the house. No sewer, I just want to be able to wash and detail cars down there.
3. Pour concrete floor
4. Finish the interior
Finally I have a place to play with my toys!
