Got my shop built. Took about 8 years of saving money, but it's up. 30x40 metal exterior pole barn style. Need to put get the POCO to run service to the building so that I can finish it out. Building has been up for about 3 months now. People who built it were supposed to put up a meter socket and have that part done....but they didn't....all in the past now and I will have to do it myself.
Anyway I picked up a GE 200A (model TSMR2020CSCUFMG meter socket combination box. Will be underground service. Bear with me as I'm new to electrical installation; and I have zero help available other than the POCO who won't touch anything beyond the meter obviously.
Does it have to be mounted close to a doorway? I assume just mount it directly to the metal using the proper screws is the correct (per NEC) way to mount it?
Arkansas...Entergy (unfortunately) if that makes any difference.
Anyway I picked up a GE 200A (model TSMR2020CSCUFMG meter socket combination box. Will be underground service. Bear with me as I'm new to electrical installation; and I have zero help available other than the POCO who won't touch anything beyond the meter obviously.
Does it have to be mounted close to a doorway? I assume just mount it directly to the metal using the proper screws is the correct (per NEC) way to mount it?
Arkansas...Entergy (unfortunately) if that makes any difference.