mobiledynamics
Well-known member
I come for the LV world where neat and tiday.....is always a plus
I have a splice box with 10 pairs of 12AWG are bundled together, zip tied and then routed back out to a 1" pipe.
Inside the splice box, I have the entire bundle zip tied all nice and neat.....
In foresight, should I unbutton them and let all the wires be *loose* so that they can breath/dissipate heat ?
I have a splice box with 10 pairs of 12AWG are bundled together, zip tied and then routed back out to a 1" pipe.
Inside the splice box, I have the entire bundle zip tied all nice and neat.....
In foresight, should I unbutton them and let all the wires be *loose* so that they can breath/dissipate heat ?
Last edited: