Came to this forum from the Trifive forum. Those guys say youse guys are pretty smart fellers.
The two post lift I have recommends 4.5" re-bar reinforced 3500 PSI concrete. I may have 4", but my psi is 3000 and I would bet is re-mesh, not re-bar.
My thoughts are to cut out two 4x5' squares where the columns for the lift go. I would dig them out to 8" depth, and put in two 8" pilasters about 36" down. I would drill holes in the sides of the opening every foot or so in order that re-bar can be epoxied in to tie in the old work with the new work. Pilasters would have re-bar in them and tied in to the new 4000 PSI 4x5' portions.
Is this enough?
Is it over kill?
Am I crazy?
Jemez (hay-mez)
The two post lift I have recommends 4.5" re-bar reinforced 3500 PSI concrete. I may have 4", but my psi is 3000 and I would bet is re-mesh, not re-bar.
My thoughts are to cut out two 4x5' squares where the columns for the lift go. I would dig them out to 8" depth, and put in two 8" pilasters about 36" down. I would drill holes in the sides of the opening every foot or so in order that re-bar can be epoxied in to tie in the old work with the new work. Pilasters would have re-bar in them and tied in to the new 4000 PSI 4x5' portions.
Is this enough?
Is it over kill?
Am I crazy?
Jemez (hay-mez)