I have finally gotten going on my 30x36 budget build. I'm doing as much as I can on this project that makes sense for me to do. It will be a 6inch slab with 1x 1 foot footer. I will not be pouring the concrete but will be doing most of the upfront prep. If I get a good price i'll let an excavation contractor do it.
The lot is open with a slight decline of maybe 6" to a foot over the 30 feet. All currently grass. 20 years ago I filled this area with sandy soil from another part of the yard. so this area is about a foot above neighbors land but no drainage issues to worry about.
My question is how much soil to remove and what to put down? The more threads I read the more confused I am as to the type of rock. also would I aim to have an even slab by setting the front of the slab close to the current top soil and the rear with more exposed? The guy I want to ask first is a neighborhood guy that has a backhoe. after its mostly framed in and its time to add the stone and compact is the best method to compact with a plate compactor or is tamping it or whatever with a backhoe sufficient? If I do it i'd need a few deliveries of stone and a lot of hand moving of the product along with a week rental on the compactor.
Here is a test pit I dug to show the layering. hole is about 1.5 feet deep.

This is the soil excavated under the sod layer

new pup is impressed with my digging

appreciate any input
The lot is open with a slight decline of maybe 6" to a foot over the 30 feet. All currently grass. 20 years ago I filled this area with sandy soil from another part of the yard. so this area is about a foot above neighbors land but no drainage issues to worry about.
My question is how much soil to remove and what to put down? The more threads I read the more confused I am as to the type of rock. also would I aim to have an even slab by setting the front of the slab close to the current top soil and the rear with more exposed? The guy I want to ask first is a neighborhood guy that has a backhoe. after its mostly framed in and its time to add the stone and compact is the best method to compact with a plate compactor or is tamping it or whatever with a backhoe sufficient? If I do it i'd need a few deliveries of stone and a lot of hand moving of the product along with a week rental on the compactor.
Here is a test pit I dug to show the layering. hole is about 1.5 feet deep.

This is the soil excavated under the sod layer

new pup is impressed with my digging

appreciate any input