doctordirt
Well-known member
- Joined
- May 15, 2014
- Messages
- 492
Our rental company rents the mud mixer, $80.00 for 4 hours
This is the same place where people buy a 2 post lift to change the oil in their car twice a year.How much are you mixing to justify one? They look neat but at over $3k, it feels like a stretch.
It also doesn't look like a machine that justifies that price tag. I wonder if there is something I am missing or if they charge that just because they can
Hey, no kink shaming.This is the same place where people buy a 2 post lift to change the oil in their car twice a year.
But if I was going to spend that much, I'd buy something I'd use more often. Sure, if you're restoring/customizing cars or trucks, great. But I'd buy a nice TIG machine or blast cabinet first.I dont fault anyone for buying a nice and expensive tool. I certainly have my share of them
Arm day is canceled for a couple of days. Nice workDid 60 @80lb bags in three hours, including hauling the bags 100' from the driveway to the build site in a gorilla cart.
My back is now having spasmsArm day is canceled for a couple of days. Nice work
My back is now having spasms
80's are too heavy for me. I recently did a block project and stuck with 60's because of that. Even those are rough to deal with in quantityThis is why I try to avoid lifting 80lb bags - too heavy. Next time I need to do some concrete (likely new pumphouse on parent's estate) I'll drag the bags out of my truck and slide them onto the loader bucket. As I've gotten older, I'm a bit less cavalier about straining things.



