Ball park. $50/hour ? $100/hour ?
I want a new load center installed. I will purchase it all parts. The existing load center has less than 24 circuits. Surface mount to a poured wall. No ceiling. All circuit come in from overhead.
In my mind, the steps required are
I want a new load center installed. I will purchase it all parts. The existing load center has less than 24 circuits. Surface mount to a poured wall. No ceiling. All circuit come in from overhead.
In my mind, the steps required are
- pull meter
- disconnect feed and all circuits in load center
- remove old load center
- install new load center with breakers
- connect feed and all circuits
- re-install meter