Working on fixing my deck a bit. When built, they didn't use hangers, so the joist has pulled away slightly in spots. It was suggested I use structural screws (i.e. ledgerlok) to **** everything back together instead of adding hangers.
I've got a plan in mind already, curious what everyone thinks.
Deck is pushing 40, but 90% covered and built with the old PT so the frame is still solid.
I've got a plan in mind already, curious what everyone thinks.
Deck is pushing 40, but 90% covered and built with the old PT so the frame is still solid.
