Well, there’s always something to be done... today I was sitting in garage looking at what should I get into today. I knew I also had some “Hey, when you get a minute” projects at my MIL so I just to drive down the street to the 5 Stitches Garage H2. How long could they take right?
I started by reprogramming the sprinklers and while doing that she asked to fix the flip down drawer in kitchen. Looked at it tightened up screws then tried it and they flew out. So out to the garage to find a slightly bigger screw and after all that still didn’t close right. I think she wore out the return springs. When Lowe’s comes to do master bedroom/ master bath remodel will have them look at it since they installed it just over a year ago.
I then go back outside to finish reprogramming the sprinklers and start to work on this table on the floor.
I look around for the wood glue and realize I brought it down to my house. Jump in truck drive down block and get glue, long screws and stuff for other project. I glue up leg.
I told her I’ll put wheel on it but legs aren’t strong enough for wheel so roll out the monster.
After alittle work I built some support into the legs.
My MIL loves having them tables around. It allows her to put stuff on it and roll it around. The other table is something my FIL made years ago and it still working but this is slight bit lower and my stable.
Now she would was super happy with it.