Mr.ratchet
Active member
Well I have lived in my house now for 4 years and before we moved in I told the wife the first project was the garage. Well I got the the electrical done the first winter and the walls mud, taped, and painted that spring. Early summer I got the floor epoxied and then moved my tools in from the in-laws in soon after. Then came the honey do list. You know oh I thought YOU were going to put the fireplace in soon and I really need the laundry organizer and you know we need an office so we can get the HOUSE organized. Well I finally said enough I can't live out of boxes any more. Besides she is side tracked with the new baby (5 months old on the 18th).
So here are a couple of pictures before I got started.
The picture below is the wall I am building cabinets for. I will have uppers and lowers. The lowers are going to "Float or cantilever out. I don't want them on the floor so it is easier to sweep and keep the rodents from nesting. I plan on 10-16 feet of cabinets.
So here are a couple of pictures before I got started.
The picture below is the wall I am building cabinets for. I will have uppers and lowers. The lowers are going to "Float or cantilever out. I don't want them on the floor so it is easier to sweep and keep the rodents from nesting. I plan on 10-16 feet of cabinets.
Attachments
Last edited:
