freudianfloyd
Well-known member
I have posted some of the things I have been given at work before, but today's score was completely unexpected. I was talking to one of the guys in the manufacturing department when the facilities manager walked by and asked if I wanted the cranes. ( they recently remodeled the entire building and removed all of them) I said sure without really knowing what all was included. I knew there were a few, but I had no idea how many.
[/URL][/IMG]
The jibs were included but I forgot a picture of them.
Then the fabrication manager told me about some other things they were clearing out. Those C clamps are 12" Hargraves.
[/URL][/IMG]
[/URL][/IMG]
And its hard to tell in this picture but there is a large pile of lifting straps and pipe clamps.
[/URL][/IMG]
Of course when I got home I realized that I put a bunch of vise grips and clamps in a box to make it easier to carry to my truck and forgot it, I will post pictures of it tomorrow.
Now to find out a use for 5 hoists.
The jibs were included but I forgot a picture of them.
Then the fabrication manager told me about some other things they were clearing out. Those C clamps are 12" Hargraves.
And its hard to tell in this picture but there is a large pile of lifting straps and pipe clamps.
Of course when I got home I realized that I put a bunch of vise grips and clamps in a box to make it easier to carry to my truck and forgot it, I will post pictures of it tomorrow.
Now to find out a use for 5 hoists.
Last edited:
