To avoid these ads, REGISTER NOW!

The poncharossa

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
:rocker: I finally got my loan to begin work on my 40'x80'X16' Man Castle. It will sit on a 1/2 acre of land . Site work has begun removing trees and stumps. I should start on the building pad this Friday. Pictures to come.
 
To avoid these ads, REGISTER NOW!

CNGsaves

Well-known member
Joined
Sep 26, 2012
Messages
13,233
Location
KS and OK
Will this be in Virginia City . . . just like the Ponderosa ???

You got Hoss and Little Joe to help in the build ???
 
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
This is a copy of the approval floor plan it needed a little tweeking. like the door at the porch will be double french doors, and a gable on the porch to match up with the 120'x20' awninig on the north side of the building.
i'm in the process of building the pad for the building 50'x100'x2'.
Foundation work should begin in two weeks .
 

Attachments

  • PONCH FLOOR PLAN-page-003.jpg
    PONCH FLOOR PLAN-page-003.jpg
    133.8 KB · Views: 493
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
It surel has been a long wet 3 months, it has actually averaged to rain 3 days out of every FRICKIN week since I got the ok to build. I finally have something to look at. A picture is worth a thousand words.
Once I learn how to attach my Ponchorosa album.
 
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Looks like day 3 went pretty good. The crew should finish the metal tomorrow except for trim and gutters.
 

Attachments

  • BLD-ERECTION DAY 3 007.jpg
    BLD-ERECTION DAY 3 007.jpg
    90.4 KB · Views: 80
  • BLD-ERECTION DAY 3 006.jpg
    BLD-ERECTION DAY 3 006.jpg
    55.6 KB · Views: 82
  • BLD-ERECTION DAY 3 005.jpg
    BLD-ERECTION DAY 3 005.jpg
    52.3 KB · Views: 78
  • BLD-ERECTION DAY 3 004.jpg
    BLD-ERECTION DAY 3 004.jpg
    59.3 KB · Views: 80
  • BLD-ERECTION DAY 3 003.jpg
    BLD-ERECTION DAY 3 003.jpg
    77 KB · Views: 80
  • BLD-ERECTION DAY 3 002.jpg
    BLD-ERECTION DAY 3 002.jpg
    71.7 KB · Views: 77
  • BLD-ERECTION DAY 3 001.jpg
    BLD-ERECTION DAY 3 001.jpg
    67.3 KB · Views: 83
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
The company's name is S&S Steel Buildings. Located in Louisiana near Breaux Bridge, about 50miles west of Baton Rouge. Its all engineered and rated for 105mph winds. They have a beam maker and pretty much fab it all. from flat bar to rolls of metal for walls and roof.
 
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
the bldg. 40'x80'x16' along with a 15'x40'x14' screened front porch and a 20'x 95'x14' awning on the door side. The apartment will be 40'x32'
 
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
I will have a 2 post lift for the automotive section along with a pad to set my 2002 "B4C" Black on Black Camaro LACRISHA, tools work bench ect.
A fabrication section with a big Fab table, welders tig, mig, & stick. A cutting rig grinders and other fab tools.
A wood working section with planner, tablesaw, jointer, bandsaw, radial armsaw. miter saw ect.
everything that can have wheels on it will to make room for what ever project I have going
at the time. I will have the awning with enough recepticals to work out side if need to.
 
To avoid these ads, REGISTER NOW!
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
:beer:Day 4 completed the 1st phase of the metal building part.
Today the Framing crew arrived and began framing the living quaters.
 

Attachments

  • BLD-ERECTION DAY 4 001.jpg
    BLD-ERECTION DAY 4 001.jpg
    131 KB · Views: 127
  • BLD-ERECTION DAY 4 002.jpg
    BLD-ERECTION DAY 4 002.jpg
    63.9 KB · Views: 97
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
The end of Day 1 of framing, Mr. Danny Melancon, his son and Speddy Gonzales.
 

Attachments

  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (2).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (2).jpg
    66.7 KB · Views: 84
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (1).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (1).jpg
    62.2 KB · Views: 86
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (3).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (3).jpg
    61.1 KB · Views: 85
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (4).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (4).jpg
    54.3 KB · Views: 78
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (5).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (5).jpg
    63.5 KB · Views: 80
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (6).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (6).jpg
    63.2 KB · Views: 79
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (7).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (7).jpg
    68.8 KB · Views: 80
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Continued Day 1 of framing.
 

Attachments

  • DAY 1 OF  FRAMING LIVING QUATERS_1935.jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935.jpg
    63.2 KB · Views: 40
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (9).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (9).jpg
    52.6 KB · Views: 41
  • DAY 1 OF  FRAMING LIVING QUATERS_1935 (8).jpg
    DAY 1 OF FRAMING LIVING QUATERS_1935 (8).jpg
    61.6 KB · Views: 43
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Thursday was a really good day of framing. Lil Danny and Speed must have eatin their SPINACH. They remindded of 2 cat squirrels building a nest before winter.
 

Attachments

  • Framing living Quaters day 2&3 001.jpg
    Framing living Quaters day 2&3 001.jpg
    74.8 KB · Views: 62
  • Framing living Quaters day 2&3 002.jpg
    Framing living Quaters day 2&3 002.jpg
    68.6 KB · Views: 59
  • Framing living Quaters day 2&3 007.jpg
    Framing living Quaters day 2&3 007.jpg
    72.2 KB · Views: 50
  • Framing living Quaters day 2&3 006.jpg
    Framing living Quaters day 2&3 006.jpg
    78.1 KB · Views: 53
  • Framing living Quaters day 2&3 005.jpg
    Framing living Quaters day 2&3 005.jpg
    76.9 KB · Views: 54
  • Framing living Quaters day 2&3 004.jpg
    Framing living Quaters day 2&3 004.jpg
    59.8 KB · Views: 54
  • Framing living Quaters day 2&3 003.jpg
    Framing living Quaters day 2&3 003.jpg
    61.6 KB · Views: 55
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Thursday nite came and about 11:00 PM the ARTIC BLAST HIT. Rain , Freezing rain,Sleet ans SNOW. Can you imagine that, so much for Global Warmin.
I-10 and every Bridge aroun froze. No work until the Thaw!!!!
Anyway Danny and Speedy made it by and made another day. They fixed a big O **** the double french door was laid out 6'ft too far to the east so they mooved it back towards the middle of the building.
 

Attachments

  • Framing living Quaters day 2&3 011.jpg
    Framing living Quaters day 2&3 011.jpg
    46.1 KB · Views: 58
  • Framing living Quaters day 2&3 010.jpg
    Framing living Quaters day 2&3 010.jpg
    83.3 KB · Views: 57
  • Framing living Quaters day 2&3 009.jpg
    Framing living Quaters day 2&3 009.jpg
    79 KB · Views: 57
  • Framing living Quaters day 2&3 007.jpg
    Framing living Quaters day 2&3 007.jpg
    72.2 KB · Views: 48
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
[Days 5,6,&7 of the living quaters started out in the Snow and ended up Hot humid and nasty but the show goes on.
 

Attachments

  • Framing living Quaters day 5,6&7 009.jpg
    Framing living Quaters day 5,6&7 009.jpg
    79.2 KB · Views: 53
  • Framing living Quaters day 5,6&7 008.jpg
    Framing living Quaters day 5,6&7 008.jpg
    81.1 KB · Views: 54
  • Framing living Quaters day 5,6&7 007.jpg
    Framing living Quaters day 5,6&7 007.jpg
    79.5 KB · Views: 61
  • Framing living Quaters day 5,6&7 006.jpg
    Framing living Quaters day 5,6&7 006.jpg
    60.8 KB · Views: 62
  • Framing living Quaters day 5,6&7 005.jpg
    Framing living Quaters day 5,6&7 005.jpg
    63.1 KB · Views: 64
  • Framing living Quaters day 5,6&7 002.jpg
    Framing living Quaters day 5,6&7 002.jpg
    99.8 KB · Views: 63
  • Framing living Quaters day 5,6&7 001.jpg
    Framing living Quaters day 5,6&7 001.jpg
    84.7 KB · Views: 64
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Continue day 5,6,&7.
 

Attachments

  • Framing living Quaters day 5,6&7 019.jpg
    Framing living Quaters day 5,6&7 019.jpg
    60.7 KB · Views: 69
  • Framing living Quaters day 5,6&7 018.jpg
    Framing living Quaters day 5,6&7 018.jpg
    60.3 KB · Views: 64
  • Framing living Quaters day 5,6&7 017.jpg
    Framing living Quaters day 5,6&7 017.jpg
    67.8 KB · Views: 73
  • Framing living Quaters day 5,6&7 014.jpg
    Framing living Quaters day 5,6&7 014.jpg
    47.5 KB · Views: 56
  • Framing living Quaters day 5,6&7 013.jpg
    Framing living Quaters day 5,6&7 013.jpg
    49.6 KB · Views: 57
  • Framing living Quaters day 5,6&7 011.jpg
    Framing living Quaters day 5,6&7 011.jpg
    69.7 KB · Views: 52
  • Framing living Quaters day 5,6&7 010.jpg
    Framing living Quaters day 5,6&7 010.jpg
    76.3 KB · Views: 52
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
cont.
 

Attachments

  • Framing living Quaters day 5,6&7 020.jpg
    Framing living Quaters day 5,6&7 020.jpg
    142.3 KB · Views: 32
  • Framing living Quaters day 5,6&7 021.jpg
    Framing living Quaters day 5,6&7 021.jpg
    68.7 KB · Views: 32
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Day 8 of Framing Living quaters, installed hand rails joist hangers and brick ties that it for framers until doors and windows. Electrical rough-in and Pluming in the A.M.
 

Attachments

  • Framing living Quaters day 8 007.jpg
    Framing living Quaters day 8 007.jpg
    51.7 KB · Views: 68
  • Framing living Quaters day 8 006.jpg
    Framing living Quaters day 8 006.jpg
    65.9 KB · Views: 74
  • Framing living Quaters day 8 005.jpg
    Framing living Quaters day 8 005.jpg
    131.5 KB · Views: 70
  • Framing living Quaters day 8 003.jpg
    Framing living Quaters day 8 003.jpg
    139.3 KB · Views: 79
  • Framing living Quaters day 8 002.jpg
    Framing living Quaters day 8 002.jpg
    54.5 KB · Views: 73
  • Framing living Quaters day 8 001.jpg
    Framing living Quaters day 8 001.jpg
    53.6 KB · Views: 69
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Continued
 

Attachments

  • Rough in electrical and pluming of living Quaters 020.jpg
    Rough in electrical and pluming of living Quaters 020.jpg
    54.1 KB · Views: 57
  • Rough in electrical and pluming of living Quaters 019.jpg
    Rough in electrical and pluming of living Quaters 019.jpg
    51.8 KB · Views: 69
  • Rough in electrical and pluming of living Quaters 018.jpg
    Rough in electrical and pluming of living Quaters 018.jpg
    54.8 KB · Views: 53
  • Rough in electrical and pluming of living Quaters 013.jpg
    Rough in electrical and pluming of living Quaters 013.jpg
    60 KB · Views: 52
  • Rough in electrical and pluming of living Quaters 012.jpg
    Rough in electrical and pluming of living Quaters 012.jpg
    65.5 KB · Views: 56
  • Rough in electrical and pluming of living Quaters 011.jpg
    Rough in electrical and pluming of living Quaters 011.jpg
    50.7 KB · Views: 46
  • Rough in electrical and pluming of living Quaters 010.jpg
    Rough in electrical and pluming of living Quaters 010.jpg
    61.9 KB · Views: 43
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Thanks for the information on your product. My floor man is checking on the type of sealer he had purchased with the Kemkio concrete stain product he has for the floors. Once I see what he purchased for the shop area I'll be giving you a call.
 
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Clean and stain floors. After the floor was stained the Rains come again. It might be dry enough to apply sealer by Friday. Im thinking about setting out some crawfish traps in the yard. They are starting to come out of the ground from all the fricken rain!!!!!!!!!!!!
 

Attachments

  • CLEAN AND STAIN FLOORS 019.jpg
    CLEAN AND STAIN FLOORS 019.jpg
    52.6 KB · Views: 50
  • CLEAN AND STAIN FLOORS 018.jpg
    CLEAN AND STAIN FLOORS 018.jpg
    52.4 KB · Views: 49
  • CLEAN AND STAIN FLOORS 017.jpg
    CLEAN AND STAIN FLOORS 017.jpg
    138.6 KB · Views: 48
  • CLEAN AND STAIN FLOORS 016.jpg
    CLEAN AND STAIN FLOORS 016.jpg
    55.9 KB · Views: 49
  • CLEAN AND STAIN FLOORS 015.jpg
    CLEAN AND STAIN FLOORS 015.jpg
    142.3 KB · Views: 55
  • CLEAN AND STAIN FLOORS 006.jpg
    CLEAN AND STAIN FLOORS 006.jpg
    64.3 KB · Views: 46
  • CLEAN AND STAIN FLOORS 005.jpg
    CLEAN AND STAIN FLOORS 005.jpg
    63.4 KB · Views: 45
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
:eyecrazy::headscrat:(:wtf: IT IS 8 DAYS AND COUNTING WAITING ON FLOORS TO DRY FOR LAST COAT OFTHE SEALER THIS FRICKEN WEATHER IS DRIVING ME NUTSSSSSSSSS. ITS EATHER 20 DEG. AND RAINING OR 75DEG. AND THE FLOOR IS SWEATING.............. WE DID MANAGE THE 1st COAT OF SEALER YESTERDAY AFTERNOON
 

Attachments

  • OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 009.jpg
    OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 009.jpg
    68 KB · Views: 55
  • OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 008.jpg
    OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 008.jpg
    81.8 KB · Views: 55
  • OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 005.jpg
    OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 005.jpg
    64.7 KB · Views: 69
  • OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 001.jpg
    OSB ON CIELING IN KITCHEN & LIVING AREA ALONG WITH 1ST COAT SEAL 001.jpg
    52.5 KB · Views: 62
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
Hopefully you will see it by the end of March. we are back on track three different contractors are working on it today. HVAC, Electrical & Plumbing. If the rain holds out by Friday farming the lean to for the west side of the building should take place and we can get out of the MUD.:3gears::3gears::3gears::bounce:
 
OP
P

PonchoL

Well-known member
Joined
Mar 21, 2013
Messages
72
Location
Plaquemine, La.
:rocker::lol:We had a pretty good day,the heating and air started. The electrical Panel and some wire installed and some plumbing.
 

Attachments

  • Today  HVAC,Electical and Plumbing 001.jpg
    Today HVAC,Electical and Plumbing 001.jpg
    54.4 KB · Views: 60
  • Today  HVAC,Electical and Plumbing 002.jpg
    Today HVAC,Electical and Plumbing 002.jpg
    145.1 KB · Views: 70
  • Today  HVAC,Electical and Plumbing 003.jpg
    Today HVAC,Electical and Plumbing 003.jpg
    134.1 KB · Views: 55
  • Today  HVAC,Electical and Plumbing 004.jpg
    Today HVAC,Electical and Plumbing 004.jpg
    127.6 KB · Views: 58
To avoid these ads, REGISTER NOW!
Top Bottom