S&A, it will be stored at another one of our tower sites. Not really a good way to make a garage out of it, modifying galvanized steel ***** if you have to weld it.
Cas, there is probably about 400’ of cable to strip, the rest is just cut into 4’ ish lengths, although if the price is way down, it would have to be cut in half lengthwise to get the copper out. If that happens, there will be about 2400’ to cut and lots of that will be waste material, foam and jacket. The tower was originally put up by a cellular company that got bought out by AT&T, the tower itself was bought and sold many times, all the equipment leftover was from Verizon, they had a clause in their lease that said they could abandon it and whoever owned the tower would have to deal with it. We were paid to take ownership of the tower, I negotiated that after they tried to just “give” it to us, so we were essentially paid to remove the tower.
Orion, the tube may be too heavy for a gate, won’t know until it is down, but if you want some, I can make that happen. It won’t be apart completely u til most likely next week.
We are getting an early start, looks like the weather will cooperate for once, I still have my fingers crossed and maybe my toes too.